USAF Falcon Stadium

Written by Sample post author | Jul 12, 2023 7:04:59 PM

Nestled amidst the majestic Rampart Range of the Rocky Mountains, Falcon Stadium emerges as an epitome of magnificence and excellence in college football. Its awe-inspiring location and captivating ambiance make it undeniably one of the most prestigious college football arenas in the entire United States.

Perched at an impressive altitude of 6,621 feet above sea level, Falcon Stadium luxuriates in the rarefied air, proving advantageous for the Falcons. Standing tall, it surpasses almost all Division I-A stadiums in terms of elevation, proudly showcasing the team's unwavering determination and resilience. Currently, the stadium has a seating capacity of 46,692 spectators eagerly awaiting the exhilarating football games unfolding on its sacred turf.

 

 

Project Name: USAF Falcon Stadium

Client Name: Olson Plumbing & Heating

Address: 4900 Stadium Blvd. Air Force Academy, CO 80840

Services: Detailing, Spooling

Size: 49,500 sqft

Property Owner: United States Air Force Academy

Date: 1/1/23 - in progress

Duration of Project: 5 months (est.)

 

 

 

 

The Challenge

Facing a major hurdle, the project encountered a significant setback as submittals were not approved on time and the design for the UG and Reefer piping remained incomplete. This unfortunate delay resulted in a two-month setback in the schedule, but remarkably, it did not affect the deliverable schedule for the UG.

 

The Solution

To overcome this challenge, ICON cleverly created ample space for equipment and strategically planned to replace the correct RFA's as soon as they were received. Additionally, ICON went above and beyond by adding two extra detailers to ensure that the scheduled deliverable dates were met precisely and efficiently.

 

Results

Ongoing work is being carried out to achieve the desired results.